Registration services will be closed on Monday, Dec 15th at 11:59 PM and will reopen on Wednesday, Dec 17th, at 12:01 AM. This pause is necessary to ensure data integrity during Canvas roster maintenance.
Division of Facilities, Design and Construction Management
Sustainable Features
Green Roof
Center for the Built Environment and Infrastructure Studies
Earl S. Richardson Library
Business Management Complex
Photovoltaic Glazing
Center for the Built Environment and Infrastructure Studies
Photovoltaic Electric Panels
Center for the Built Environment and Infrastructure Studies
Solar Water Heating Panels
Center for the Built Environment and Infrastructure Studies
Rain Water Harvesting
Center for the Built Environment and Infrastructure Studies
Bio Retention Pond
Center for the Built Environment and Infrastructure Studies
Reduction of Solar Heat Gain
Center for the Built Environment and Infrastructure Studies
Earl S. Richardson Library